Tillery Unit 1 Dissolved Oxygen Runner Replacement
Mount Gilead, North Carolina
Crowder replaced the existing dissolved oxygen runner with a new, modernized runner that will enrich the discharge water with oxygen. This helps the aquatic species. This will also help the performance the hydro turbine to allow more water flow to generate power to the grid.
A monorail beam was used to help with installation, which was fabricated in our own fabrication shop at Crowder Industrial Construction.
Specific challenges to overcome on this project were summer peak-power demands and owner-supplied equipment that had to be modified to ensure proper installation.

Renewable Energy
Power
Industrial
Electrical
Water & Wastewater
Transportation
Fabrication
Dams
Diascund Dam Rehabilitation
Glenville Lake Dam Rehabilitation
Lake Townsend Dam
Langley Pond Dam Rehabilitation
Table Rock Dam and Intake Structure
New Flyover Clears Path for Safer Landfill Access
Crowder CEO Lynn Hansen Speaks at AGC Press Conference in Charlotte
Crowder Wins 2026 CAGC Community Impact Award
Crowder Wins 2024 Construction Excellence Award
Women of Construction and Engineering: Three Women; Three Stories