Roanoke Rapids Skimmer Gate Replacement
Roanoke Rapids, North Carolina
The gate was modified from the original gate design to allow the hydro plant to use the new skimmer gate as a mini-flow option, as well as a method to control the lake levels.
Crowder procured and replaced the skimmer gate system, hoist and hoist controls, gate structure, gate slots, gate guides, wheel, and rails. The skimmer gate fish rack was repaired during the replacement of the skimmer gate system.

Renewable Energy
Power
Industrial
Electrical
Water & Wastewater
Transportation
Fabrication
Dams
Diascund Dam Rehabilitation
Glenville Lake Dam Rehabilitation
Lake Townsend Dam
Langley Pond Dam Rehabilitation
Table Rock Dam and Intake Structure
Crowder Wins 2024 Construction Excellence Award
Women of Construction and Engineering: Three Women; Three Stories
A Rad Skatepark Lies Atop 5.2 Million Gallons of Water
Harnessing the Transformative Potential of Collaborative Delivery to Achieve Diversity, Equity, and Inclusion
An Optimistic Outlook on Aging Water Infrastructure













