Roanoke Rapids Gate Hoist Refurbishment
Roanoke Rapids, North Carolina
The Cleveland Gear boxes were obsolete. Crowder teamed up with an engineering firm to find the latest gear boxes that could replace the original with minimum
modifications as possible.
Modifications to the existing frame were made to house the new gear boxes along with new mounting plates to anchor the gear boxes.
Crowder replaced all gear boxes, spur gears, shafts, shaft couplings, drive motors and drive motor couplings. The Hoist frames were modified to accept the new drive components.

Renewable Energy
Power
Industrial
Electrical
Water & Wastewater
Transportation
Fabrication
Dams
Diascund Dam Rehabilitation
Glenville Lake Dam Rehabilitation
Lake Townsend Dam
Langley Pond Dam Rehabilitation
Table Rock Dam and Intake Structure
New Flyover Clears Path for Safer Landfill Access
Crowder CEO Lynn Hansen Speaks at AGC Press Conference in Charlotte
Crowder Wins 2026 CAGC Community Impact Award
Crowder Wins 2024 Construction Excellence Award
Women of Construction and Engineering: Three Women; Three Stories









