Gaston Shoals South Traveling Hoist Refurbishment
Roanoke Rapids, North Carolina
With the existing hoist system being over 100 years old, the client decided to keep the historical hoist and have it refurbished. Crowder replaced all the gearboxes, drive train, electrical components, repaired the main structure, and finished it off with a fresh coat of paint. Our CIC Fabrication Shop fabricated the shaft guards used in this project.
A main challenge to overcome on this project was finding replacement parts for the existing, outdated parts.
Crowder Industrial self-performed 90% of the work for this project, while the remaining work was subcontracted to handle coatings and paint.

Renewable Energy
Power
Industrial
Electrical
Water & Wastewater
Transportation
Fabrication
Dams
Diascund Dam Rehabilitation
Glenville Lake Dam Rehabilitation
Lake Townsend Dam
Langley Pond Dam Rehabilitation
Table Rock Dam and Intake Structure
Crowder Wins 2024 Construction Excellence Award
Women of Construction and Engineering: Three Women; Three Stories
A Rad Skatepark Lies Atop 5.2 Million Gallons of Water
Harnessing the Transformative Potential of Collaborative Delivery to Achieve Diversity, Equity, and Inclusion
An Optimistic Outlook on Aging Water Infrastructure