installed the air pollution control equipment for anew turbine
installation at this waste-to-energy electric generating facility.
The scope of work included the erection of a 10-module fabric filter
system, a spray dryer absorber, ID fan, lime injection system, carbon
injection system, structural steel, all associated piping, all
associated electrical power, and I/C work. Also included was the
erection of the ductwork from the boiler economizer to the APC
equipment and from the APC equipment to the stack.

Renewable Energy
Power
Industrial
Electrical
Water & Wastewater
Transportation
Fabrication
Dams
Diascund Dam Rehabilitation
Glenville Lake Dam Rehabilitation
Lake Townsend Dam
Langley Pond Dam Rehabilitation
Table Rock Dam and Intake Structure
Crowder Wins 2024 Construction Excellence Award
Women of Construction and Engineering: Three Women; Three Stories
A Rad Skatepark Lies Atop 5.2 Million Gallons of Water
Harnessing the Transformative Potential of Collaborative Delivery to Achieve Diversity, Equity, and Inclusion
An Optimistic Outlook on Aging Water Infrastructure