Upper McAlpine Creek - Sanitary Sewer Interceptor Project
This was one of Crowder’s first progressive design build Sanitary Sewer projects with Charlotte Water. The project consisted of over 2 miles of 30” gravity sewer, a mile and a half of trench rock blasting and 49 manholes. A total of 36 bypass pumping setups were required to construct the new 30” mainline that tied in to an active sewer. The project began in March of 2021 and wrapped up in January of 2023 and it was a huge success for both Crowder and Charlotte Water.

Renewable Energy
Power
Industrial
Electrical
Water & Wastewater
Transportation
Fabrication
Dams
Diascund Dam Rehabilitation
Glenville Lake Dam Rehabilitation
Lake Townsend Dam
Langley Pond Dam Rehabilitation
Table Rock Dam and Intake Structure
Crowder Wins 2024 Construction Excellence Award
Women of Construction and Engineering: Three Women; Three Stories
A Rad Skatepark Lies Atop 5.2 Million Gallons of Water
Harnessing the Transformative Potential of Collaborative Delivery to Achieve Diversity, Equity, and Inclusion
An Optimistic Outlook on Aging Water Infrastructure










