Landfills Gas to Energy Project
This Landfills Gas to Energy Project consisted of three projects. The Winder and Griffin projects were equipped with three engines and Buford project with five engines. Were equipped with a gas cleaning system consisting of gas drying, siloxane removal, carbon polishing, and multiple filters through the process. Each engine can produce over 2,100 kW power depending on gas composition. All three projects were completed by middle of July 2016.

Renewable Energy
Power
Industrial
Electrical
Water & Wastewater
Transportation
Fabrication
Dams
Diascund Dam Rehabilitation
Glenville Lake Dam Rehabilitation
Lake Townsend Dam
Langley Pond Dam Rehabilitation
Table Rock Dam and Intake Structure
Crowder Wins 2024 Construction Excellence Award
Women of Construction and Engineering: Three Women; Three Stories
A Rad Skatepark Lies Atop 5.2 Million Gallons of Water
Harnessing the Transformative Potential of Collaborative Delivery to Achieve Diversity, Equity, and Inclusion
An Optimistic Outlook on Aging Water Infrastructure