Combined Heat and Power (CHP) Construction
South Carolina
The project consisted of one gas turbine generator that produces 14 MW of power and exhausting heat into a single pressure heat recovery steam generator (HRSG). The HRSG produces about 100,000lbs/hour of saturated steam at psig. The Scope of work included performing the site work, site utilities, asphalt paving, site finishing, and security fencing. Crowder procured and constructed the building enclosure, including the concrete slab and foundations, structural steel, architectural siding, roofing, interior finishes, mechanical, electrical, plumbing, and life safety systems for the building.

Renewable Energy
Power
Industrial
Electrical
Water & Wastewater
Transportation
Fabrication
Dams
Diascund Dam Rehabilitation
Glenville Lake Dam Rehabilitation
Lake Townsend Dam
Langley Pond Dam Rehabilitation
Table Rock Dam and Intake Structure
Crowder Wins 2024 Construction Excellence Award
Women of Construction and Engineering: Three Women; Three Stories
A Rad Skatepark Lies Atop 5.2 Million Gallons of Water
Harnessing the Transformative Potential of Collaborative Delivery to Achieve Diversity, Equity, and Inclusion
An Optimistic Outlook on Aging Water Infrastructure