Ceramics Plant - Process Piping
Georgia
The scope of this project
included installation of 4,200 ft of process piping, including
setting and alignment of mechanical equipment. The piping systems
were carbon, stainless steel, copper tubing and HDPE. The systems
included all utilities and process systems. Pressure rating for these
systems ranged from atmospheric to 600psi operating pressure.

Renewable Energy
Power
Industrial
Electrical
Water & Wastewater
Transportation
Fabrication
Dams
Diascund Dam Rehabilitation
Glenville Lake Dam Rehabilitation
Lake Townsend Dam
Langley Pond Dam Rehabilitation
Table Rock Dam and Intake Structure
New Flyover Clears Path for Safer Landfill Access
Crowder CEO Lynn Hansen Speaks at AGC Press Conference in Charlotte
Crowder Wins 2026 CAGC Community Impact Award
Crowder Wins 2024 Construction Excellence Award
Women of Construction and Engineering: Three Women; Three Stories










