Boat Harbor Switchgear
Newport News, VA
The Boat Harbor Treatment Plant Switchgear and Controls Replacement was a $6.8 Million project, under Hampton Roads Sanitation District and HDR. The project consisted of upgrades to the current plant’s electrical infrastructure, approximately 500’ of duct bank, and construction of a new building housing the plant’s main switchgear. The project also consisted of modifications to the plant’s generator building and control room.

Renewable Energy
Power
Industrial
Electrical
Water & Wastewater
Transportation
Fabrication
Dams
Diascund Dam Rehabilitation
Glenville Lake Dam Rehabilitation
Lake Townsend Dam
Langley Pond Dam Rehabilitation
Table Rock Dam and Intake Structure
Crowder Wins 2024 Construction Excellence Award
Women of Construction and Engineering: Three Women; Three Stories
A Rad Skatepark Lies Atop 5.2 Million Gallons of Water
Harnessing the Transformative Potential of Collaborative Delivery to Achieve Diversity, Equity, and Inclusion
An Optimistic Outlook on Aging Water Infrastructure










