BESS Installation
South Carolina
MCRD BESS is a Battery Energy Storage System manufactured by Tesla.
Crowder Construction Company was a major subcontractor for the
project, which is part of an overall energy management system for the
site. Crowder’s scope of work consisted of batteries, inverters,
two 4,000A Switchboards and two 2,500kva 480/15,000V transformers
with equipment pads and the supporting electrical system. The system
has a capacity of 4MW/8MWhr. The project was completed in June 2018.
Crowder’s performance and quality of work resulted in a highly
satisfied client and Owner.

Renewable Energy
Power
Industrial
Electrical
Water & Wastewater
Transportation
Fabrication
Dams
Diascund Dam Rehabilitation
Glenville Lake Dam Rehabilitation
Lake Townsend Dam
Langley Pond Dam Rehabilitation
Table Rock Dam and Intake Structure
Crowder Wins 2024 Construction Excellence Award
Women of Construction and Engineering: Three Women; Three Stories
A Rad Skatepark Lies Atop 5.2 Million Gallons of Water
Harnessing the Transformative Potential of Collaborative Delivery to Achieve Diversity, Equity, and Inclusion
An Optimistic Outlook on Aging Water Infrastructure